Woodbourne Correctional Facility, NY
Exceeded the action level in the past
Latest 90th-percentile lead: 1.54 ppb (monitoring period 2021-2023). The federal action level is 15 ppb today and drops to 10 ppb in Nov 2027; EPA's health goal is 0. The latest result is under the action level, but this system has gone over 15 ppb before. Lead comes from pipes, not the source water, so a home with a lead service line can still be exposed. Test your own tap.
About Woodbourne Correctional Facility
Woodbourne Correctional Facility serves about 997 people through 13 service connections, which makes it a small system under EPA's size classes. It is owned by the state and draws groundwater, in Sullivan County, New York. EPA system ID: NY5203012; phone on file: 845-434-7730. They can tell you what your service line is made of and whether they pay to replace it.
Woodbourne Correctional Facility's lead record
That is down 3.06 ppb from 4.6 ppb in the period ending 2020. The highest 90th-percentile result EPA holds for Woodbourne Correctional Facility is 65 ppb across 5 monitoring periods, 1 of them over the 15 ppb action level.
| Period ending | 90th-percentile lead |
|---|---|
| 2023 | 1.54 ppb |
| 2020 | 4.6 ppb |
| 2020 | 1.5 ppb |
| 2019 | 65 ppb over 15 |
| 2016 | 2 ppb |
Where this result ranks
Of the 2,077 New York systems with a lead result, the median latest reading is 1.5 ppb; 17 are over 15 ppb right now and 165 have gone over at some point. Woodbourne Correctional Facility's 1.54 ppb sits at the 50th percentile in New York and the 64th nationally (higher means more lead).
Neighbouring systems
64 other systems share Sullivan County; 24 of them have a higher latest lead result than Woodbourne Correctional Facility. If you are unsure which one supplies your house, the name on your water bill decides it.
| System | People | Latest lead |
|---|---|---|
| Monticello Village | 8,000 | 0 (not detected) |
| Fallsburg Who-Ls-Sf | 7,850 | 2 ppb |
| Liberty Village | 3,900 | 0 (not detected) |
| Stevensville+Rfl | 3,250 | 1 ppb |
| Swan In Swan Lake | 2,900 | - |
| Emerald Green Lake Louise Marie Wc | 2,400 | 2.65 ppb |
| Livingston Manor Wd | 1,500 | 3 ppb |
| Wurtsboro Village | 1,400 | 7.01 ppb |
| Roscoe-Rockland Wd | 1,000 | 11 ppb |
| Adelaar Wd | 1,000 | - |
What to do in your house
Test your own tap with a certified lab first-draw sample; Woodbourne, NY may offer free or low-cost kits through the utility. If your own line is lead, replacing the private side runs about $1,200-$12,300 (EPA average about $4,700). Ask Woodbourne Correctional Facility whether it covers that cost before hiring anyone - many utilities now do. Its latest copper 90th percentile is 1900 ppb (copper action level 1,300 ppb).
These figures describe homes the utility sampled, not your tap. Only your service line record or a test of your own water answers the question for your house. What a 90th-percentile result does and does not tell you: how to read a lead result. More in what a past exceedance means today.