LeadPipesCheck

Schweikart Water System, CA

Above the new 10 ppb level coming in 2027

Latest 90th-percentile lead: 14 ppb (monitoring period 2023-2025). The federal action level is 15 ppb today and drops to 10 ppb in Nov 2027; EPA's health goal is 0. Under the current 15 ppb rule this is not an exceedance, but it is above the 10 ppb action level that takes over in Nov 2027. Test your own tap; filter if your result shows lead.

Who runs the water here

Schweikart Water System serves about 27 people through 8 service connections, which makes it a very small system under EPA's size classes. It is privately owned and draws groundwater, in Kern County, California. EPA system ID: CA1502545; phone on file: 661-589-3305. Call that number and ask whether your address has a lead, galvanized or unknown service line.

Schweikart Water System's lead record

That is up 12.5 ppb from 1.5 ppb in the period ending 2022. The highest 90th-percentile result EPA holds for Schweikart Water System is 14 ppb across 4 monitoring periods, none of them over 15 ppb (1 over 10 ppb).

Period ending90th-percentile lead
202514 ppb over 10
20221.5 ppb
20190 (not detected)
20161 ppb

Where this result ranks

Of the 2,884 California systems with a lead result, the median latest reading is 0 ppb; 30 are over 15 ppb right now and 215 have gone over at some point. Schweikart Water System's 14 ppb sits at the 99th percentile in California and the 98th nationally (higher means more lead).

Nearby utilities

165 other systems share Kern County; 1 of them has a higher latest lead result than Schweikart Water System. If you are unsure which one supplies your house, the name on your water bill decides it.

SystemPeopleLatest lead
Cws - Bakersfield268,1292.8 ppb
Bakersfield, City Of171,1081.3 ppb
Delano, City Of51,4280 (not detected)
Oildale Mwc45,3150 (not detected)
Indian Wells Valley W.D.41,4740 (not detected)
Tejon Castac Wd - I5 & Laval Rd38,1250 (not detected)
Antelope Valley E Kern Wtr Agy-Rosamond37,634-
Vaughn Wc Inc37,1890 (not detected)
East Niles Csd32,5171.4 ppb
Cws - North Garden27,6344.2 ppb

Next steps for Bakersfield, CA

Test your own tap with a certified lab first-draw sample; Bakersfield, CA may offer free or low-cost kits through the utility. If your own line is lead, replacing the private side runs about $1,200-$12,300 (EPA average about $4,700). Ask Schweikart Water System whether it covers that cost before hiring anyone - many utilities now do.

These figures describe homes the utility sampled, not your tap. Only your service line record or a test of your own water answers the question for your house. The lead result guide covers how utilities pick the homes they sample. See what changes at 10 ppb in 2027.