LeadPipesCheck

London Bridge Water Works, NY

Exceeded the action level in the past

Latest 90th-percentile lead: 3 ppb (monitoring period 2025-2025). The federal action level is 15 ppb today and drops to 10 ppb in Nov 2027; EPA's health goal is 0. The latest result is under the action level, but this system has gone over 15 ppb before. Lead comes from pipes, not the source water, so a home with a lead service line can still be exposed. Test your own tap.

London Bridge Water Works at a glance

London Bridge Water Works serves about 224 people through 64 service connections, which makes it a very small system under EPA's size classes. It is privately owned and draws groundwater, in Putnam County, New York. EPA system ID: NY3903647; phone on file: 845-540-9546. Call that number and ask whether your address has a lead, galvanized or unknown service line.

Lead results over time

That is down 14 ppb from 17 ppb in the period ending 2024. The highest 90th-percentile result EPA holds for London Bridge Water Works is 30 ppb across 5 monitoring periods, 2 of them over the 15 ppb action level.

Period ending90th-percentile lead
20253 ppb
202417 ppb over 15
202414.8 ppb over 10
202430 ppb over 15
20229.2 ppb

Against other New York systems

Of the 2,077 New York systems with a lead result, the median latest reading is 1.5 ppb; 17 are over 15 ppb right now and 165 have gone over at some point. London Bridge Water Works's 3 ppb sits at the 72nd percentile in New York and the 81st nationally (higher means more lead).

Other water systems in Putnam County

97 other systems share Putnam County; 46 of them have a higher latest lead result than London Bridge Water Works. If you are unsure which one supplies your house, the name on your water bill decides it.

SystemPeopleLatest lead
Carmel Wd 25,0006.9 ppb
Cold Spring Village2,6661.7 ppb
Brewster Village2,1627.9 ppb
Continental Village Wd1,5094 ppb
Mount Ebo Ws1,5002.1 ppb
Carmel Wd 31,3500 (not detected)
Brewster Heights1,3501.5 ppb
Watchtower Bible Tract Society1,2510.4 ppb
Carmel Wd 81,0001 ppb
Hunters Glen Condominium Ws8751.5 ppb

What to do in your house

Test your own tap with a certified lab first-draw sample; West Nyack, NY may offer free or low-cost kits through the utility. If your own line is lead, replacing the private side runs about $1,200-$12,300 (EPA average about $4,700). Ask London Bridge Water Works whether it covers that cost before hiring anyone - many utilities now do.

These figures describe homes the utility sampled, not your tap. Only your service line record or a test of your own water answers the question for your house. Why sampled homes are the worst-case ones is in the guide to reading the number. Why an old exceedance still matters: over the limit before, under it now.