LeadPipesCheck

Leota, MN

Above the new 10 ppb level coming in 2027

Latest 90th-percentile lead: 11 ppb (monitoring period 2024-2026). The federal action level is 15 ppb today and drops to 10 ppb in Nov 2027; EPA's health goal is 0. Under the current 15 ppb rule this is not an exceedance, but it is above the 10 ppb action level that takes over in Nov 2027. Test your own tap; filter if your result shows lead.

About Leota

Leota serves about 225 people through 115 service connections, which makes it a very small system under EPA's size classes. It is owned by a local government (city, town, county or district) and draws groundwater, in Nobles County, Minnesota. EPA system ID: MN1530006; phone on file: 5073605139. They can tell you what your service line is made of and whether they pay to replace it.

Leota's lead record

That is up 5 ppb from 6 ppb in the period ending 2023. The highest 90th-percentile result EPA holds for Leota is 11 ppb across 4 monitoring periods, none of them over 15 ppb (1 over 10 ppb).

Period ending90th-percentile lead
202611 ppb over 10
20236 ppb
20223 ppb
20212 ppb

Against other Minnesota systems

Of the 966 Minnesota systems with a lead result, the median latest reading is 0 ppb; 7 are over 15 ppb right now and 48 have gone over at some point. Leota's 11 ppb sits at the 98th percentile in Minnesota and the 98th nationally (higher means more lead).

Neighbouring systems

11 other systems share Nobles County; 1 of them has a higher latest lead result than Leota. If you are unsure which one supplies your house, the name on your water bill decides it.

SystemPeopleLatest lead
Worthington14,05214 ppb
Adrian1,2113 ppb
Brewster5063 ppb
Ellsworth49011 ppb
Round Lake3762 ppb
Wilmont3441 ppb
Rushmore3420 (not detected)
Lismore2372 ppb
Bigelow2351 ppb
Reading751 ppb

What to do in your house

Test your own tap with a certified lab first-draw sample; Leota, MN may offer free or low-cost kits through the utility. If your own line is lead, replacing the private side runs about $1,200-$12,300 (EPA average about $4,700). Ask Leota whether it covers that cost before hiring anyone - many utilities now do.

These figures describe homes the utility sampled, not your tap. Only your service line record or a test of your own water answers the question for your house. The lead result guide covers how utilities pick the homes they sample. This system is in the band the 2027 10 ppb rule changes.