LeadPipesCheck

Fort Bend County Mud 256, TX

No lead results on file with EPA

Latest 90th-percentile lead: no result on file. The federal action level is 15 ppb today and drops to 10 ppb in Nov 2027; EPA's health goal is 0. EPA's database has no Lead and Copper Rule results for this system. Without them there is nothing to go on, so a tap test is the only way to know.

About Fort Bend County Mud 256

Fort Bend County Mud 256 serves about 47 people through 47 service connections, which makes it a very small system under EPA's size classes. It is owned by a local government (city, town, county or district) and draws groundwater, in Fort Bend County, Texas. EPA system ID: TX0790650; phone on file: 713-860-6400. Call that number and ask whether your address has a lead, galvanized or unknown service line.

Other water systems in Fort Bend County

179 other systems share Fort Bend County. If you are unsure which one supplies your house, the name on your water bill decides it.

SystemPeopleLatest lead
City Of Sugar Land80,3811.51 ppb
Fort Bend County Wcid 249,1732.81 ppb
City Of Rosenberg43,1581.87 ppb
City Of Fulshear34,0000 (not detected)
City Of Richmond25,3260 (not detected)
Fort Bend County Mud 3016,7940 (not detected)
City Of Sugar Land New Territory15,5460 (not detected)
Fort Bend County Mud 2515,3271.36 ppb
Pecan Grove Mud14,9131.3 ppb
Quail Valley Utility District14,4090 (not detected)

What to do in your house

Test your own tap with a certified lab first-draw sample; Houston, TX may offer free or low-cost kits through the utility. If your own line is lead, replacing the private side runs about $1,200-$12,300 (EPA average about $4,700). Ask Fort Bend County Mud 256 whether it covers that cost before hiring anyone - many utilities now do.

These figures describe homes the utility sampled, not your tap. Only your service line record or a test of your own water answers the question for your house. Why sampled homes are the worst-case ones is in the guide to reading the number. The action level is dropping - the 10 ppb rule from 2027.